The Great Salt Plains Midstream (GSPM) system, located in Western Oklahoma, gathers production from multiple producers operating in the SCOOP/STACK play within the greater Anadarko Basin. Constructed in 2018, the $90 million system consists of 150 miles of crude oil and natural gas gathering lines, two crude storage facilities with truck loading and rail takeaway, and a centralized 70 MMSCFD cryogenic facility with an associated 125 gpm amine treating system for CO₂ and H₂S. As project manager and EPC, Lone Cypress engineered the entire system, procured all necessary equipment, and managed construction of all gathering and treating infrastructure.